Flatland Substation- Pinal County, Arizona

Structural, Substation

Client: Ampirical Solutions, LLC

Service Completion Date: 2022/2023 

Description

The project includes the design and construction of a 230 kV Collector Substation. The site is located SE of Randolph Rd and Hway 287 in Randolph, Arizona.

Services Provided

The services provided to the client include AIS Equipment steel structure (cap bank, riser, support structure, bus support, CT & PT, switch, dead end & lightening mast) foundation, transformer pad & oil containment design, breaker foundation, switchgear, and control building foundation. This includes foundation calculations and design (strength & stability), anchor bolt plan & details (post installed anchorage), building calculations & design, equipment anchorage, material & construction specifications, shop drawings review and full-time construction support (submittal review, RFI, design changes & client meetings).

Substation foundation layout

Leave a Reply

Your email address will not be published. Required fields are marked *