EEDAS

Projects

Grandy Solar Electric Power Plant, Grandy, North Carolina

Geotechnical, Structural, Solar Energy, Renewable Energy

Client: Ecoplexus

Service Completion Date: 2019

Description

The project includes the design and construction of a 18 MW utility-scale solar electric power plant. The project is located at 6562 Caratoke Highway in Grandy, North Carolina. The site consists of approximately 118 acres.

Services Provided

EEDAS provided PCS (transformer & switchboard) foundation design, solar rack structural review and project management.

Leave a Reply

Your email address will not be published. Required fields are marked *